皇冠信用网
热门标签

KPower gets four-year PPA extension

时间:1个月前   阅读:5

usdt收款平台www.trc20.vip)是使用TRC-20协议的Usdt第三方支付平台,Usdt收款平台、Usdt自动充提平台。免费提供入金通道、Usdt钱包支付接口、Usdt自动充值接口、Usdt寄售回收。菜宝Usdt钱包一键生成Usdt钱包、一键调用API接口、一键出售Usdt。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

欧博电脑版下载www.aLLbet8.vip)是欧博集团的官方网站。欧博官网开放Allbet注册、Allbe代理、Allbet电脑客户端、Allbet手机版下载等业务。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

上一篇:U8HX.COM官网(www.eth108.vip):When will a general election be held?

下一篇:欧博开户网址:Bursa Malaysia closes broadly lower on continued profit-taking

网友评论